Kingdom Of Saudi Arabia

Building 7847 Unit.2 Najran 66244-3181

info@amak.com.sa

Office Hour: 08 AM to 05PM

HISTORY

Long Journey Of Project Developement

A JOURNEY OF EXPLORATION, INNOVATION & EXCAVATION
The history of AMAK goes back to 1967, when the mineral deposits were first discovered during an aerial survey conducted under the supervision of Mr. Hatem Al-Khalidi.Later, in 1979, an international geological and mining consultant company (Watts Griffith) was hired to carry out field development and excavation work. After developing economic feasibility studies, 3,700m of underground tunnels were developed. A 20,000-meter diamond drill and 168 holes were also bored during the process. In 1993, Arab American Shield Development Company was granted a mining concession under Royal Decree No. (M / 17) dated 1/7/1413 AH. In 2008, Al Masane Al Kobra (Amak) Mining Co. was established to develop the project to investment and production.

HISTORY

THE TIMELINE OF SUCCESS

AMAK HAS COME A LONG WAY SINCE INCEPTION

And has achieved its set ambitions. Here is a brief timeline of the history of the development of AMAK
2008

Incorporation of AMAK Co.

2008
2010

Establishment Al Masane Copper Zinc Underground Mine and Process Plant.

2010
2012

The start of the commercial production of copper and zinc concentrates.

2012
2016

Care and maintenance to set up owner mining teams.

2016
2017

Restarting of the commercial byproduct of gold and silver, dore, as a byproduct of zinc and copper streams.

2017
2019

Inauguration of a new underground portal to reach the third mining zone Moyeath.

2019
2021

The start of the production of gold from Guyan Mine and increase of total gold production.

2021

History